This is one of the electricians. First he has to chisel the cement wall where the wires will come down into every room.
The masons are doing a lot of different jobs throughout the clinic. They just put in this internal door which will section off one wing.
Here the masons are plastering the outside of the building. They are also doing plastering in the inside.
This lorry brought a load of ceiling panels. (That's Bezer Home in the distance.)
Here the ceiling panels are being installed.
More to come later!
No comments:
Post a Comment